A
AFEAuthorization for expenditure. The approved budget for a well or job. (Business)
APIAmerican Petroleum Institute. The industry body whose standards cover much of the equipment. Also used for API gravity, a measure of how light an oil is, and the API well number. (Business)
approxApproximately. "approx 1100 hrs" is not "at 1100". Keep it. (Shorthand)
avgAverage. An average, not a single reading. (Shorthand)
aziAzimuth. Compass direction of the hole in a survey reading. (Shorthand)
B
bblBarrel. 42 US gallons. (Units)
BHABottomhole assembly. The lower part of the drill string: bit, motor, collars and downhole tools. (Drilling)
BHPBottomhole pressure. Pressure at the bottom of the well. (Drilling)
BHTBottomhole temperature. Temperature at the bottom of the well. (Drilling)
BOBreak out. Unscrewing a connection, such as a joint of pipe or a tool. (Drilling)
BOEBarrel of oil equivalent. Gas converted to oil-equivalent barrels so the two can be added, commonly 6,000 cubic feet per barrel. (Production)
BOEPDBarrels of oil equivalent per day. Oil and gas production on one scale. (Production)
BOPBlowout preventer. The set of valves and rams on the wellhead that can seal the well. (Drilling)
BOPDBarrels of oil per day. Oil rate. Not to be confused with BOP, the blowout preventer. (Production)
BOPEBlowout preventer equipment. The BOP stack and its controls, choke and kill lines, as a whole. (Drilling)
BPMBarrels per minute. Pump rate, especially during fracturing. (Completions)
BSEEBureau of Safety and Environmental Enforcement. The federal agency that regulates offshore oil and gas safety in US waters. (Safety)
BUBottoms up. The time or volume it takes mud at the bottom of the hole to reach surface. (Drilling)
BWPDBarrels of water per day. Water rate. (Production)
C
CAPEX / OPEXCapital / operating expenditure. Money spent building an asset versus running it. (Business)
CBLCement bond log. A log that shows how well the cement is bonded to the casing. (Completions)
CBPComposite bridge plug. A drillable plug set in the casing to isolate one zone from another, common in plug-and-perf fracturing. (Completions)
CBUCirculate bottoms up. Pump until mud from the bottom of the hole reaches surface. (Drilling)
CCLCasing collar locator. A tool that detects casing collars, used to put tools at the right depth. (Completions)
CIBPCast iron bridge plug. A permanent plug set in the casing, often to isolate a zone or abandon a well. (Completions)
circCirculate. Pump mud around the well, down the pipe and up the annulus. (Shorthand)
cmtCement. Cement, or a cement job. (Shorthand)
CPCasing pressure. Pressure on the casing (the annulus). (Production)
CSGCasing. Steel pipe set and cemented in the hole. (Drilling)
CTCoiled tubing. Continuous steel tubing on a reel, run into the well for cleanouts, milling and other work. (Completions)
CTUCoiled tubing unit. The truck or skid that runs coiled tubing. (Completions)
D
DCDrill collar. Heavy, thick-walled pipe in the BHA that puts weight on the bit. (Drilling)
D&CDrilling and completion. The combined phase or budget. (Completions)
degDegrees. Angle or temperature; say which if it is not obvious. (Units)
DLSDogleg severity. How sharply the hole changes direction, usually in degrees per 100 ft. (Drilling)
DPDrill pipe. The pipe that makes up most of the drill string. (Drilling)
drld / drlgDrilled / drilling. "drld 9,120–9,480 ft". (Shorthand)
DSTDrill stem test. A test that flows a formation through the drill string to measure pressure and what it produces. (Drilling)
E
ECDEquivalent circulating density. The effective mud density at a depth while pumping. Higher than the static mud weight because of friction. (Drilling)
EHS / HSEEnvironment, health and safety. The function, or the topic in a report. Same meaning, different order. (Safety)
EOBEnd of build. The depth where a directional well stops building angle. (Drilling)
EPAEnvironmental Protection Agency. US federal environmental regulator. (Safety)
ESDEmergency shutdown. The system, or the event, that shuts a facility down safely. (Safety)
ESPElectric submersible pump. A downhole pump driven by an electric motor, used to lift fluid. (Completions)
estEstimated. "est 2 bbl" is an estimate, not a measurement. Keep it that way. (Shorthand)
ETAEstimated time of arrival. For a crew, a truck or a part. (Business)
EUREstimated ultimate recovery. The total a well is expected to produce over its life. Always an estimate, and should read as one. (Production)
F
FCPFlowing casing pressure. Casing pressure while the well produces. In well control FCP means final circulating pressure, so write it out if there is any doubt. (Production)
FITFormation integrity test. A pressure test below the casing shoe to a set limit, to confirm the formation can hold the mud weight planned for the next section. (Drilling)
fphFeet per hour. Rate of penetration. (Units)
FRFlame-resistant. Clothing that resists ignition, standard PPE on most sites. (Safety)
ftFeet. Depth or length. Give depths a reference: "ft MD" or "ft TVD". (Units)
FTPFlowing tubing pressure. Tubing pressure while the well produces. (Production)
G
GLGround level. A depth reference: depth measured from the ground. (Drilling)
GORGas-oil ratio. Gas produced per barrel of oil, usually in standard cubic feet per barrel. (Production)
GRGamma ray. A log of natural radioactivity, used to identify formations and correlate depths. (Completions)
H
H2SHydrogen sulfide. A toxic, flammable gas found in some wells; "sour" means it is present. (Safety)
hrsHours. After a 24-hour time, "1400 hrs", so it cannot be read as a depth. (Units)
HWDPHeavyweight drill pipe. Thicker-walled drill pipe between the collars and regular drill pipe. (Drilling)
hzHorizontal. A horizontal well or section. (Shorthand)
I
ICPInitial circulating pressure. In well control, the pump pressure at the start of killing a well. (Drilling)
inclInclination. Angle of the hole from vertical in a survey reading. Elsewhere in notes, "incl" usually means "including". (Shorthand)
IPInitial production. A well’s early production rate, often a 24-hour or 30-day figure. Say which. (Production)
ISIPInstantaneous shut-in pressure. Pressure right after pumping stops in a frac stage. (Completions)
J
JHA / JSAJob hazard analysis / job safety analysis. A written review of a task’s steps, hazards and controls before work starts. (Safety)
K
KBKelly bushing. The usual depth reference on a land rig: depths are measured from the rig floor. See also RKB. (Drilling)
KOPKickoff point. The depth where a well starts to turn away from vertical. (Drilling)
ktsKnots. Wind or current speed offshore. (Units)
L
LACTLease automatic custody transfer. The metering unit where oil changes hands from producer to buyer. (Production)
LCMLost circulation material. Material added to the mud to plug a formation that is taking fluid. (Drilling)
LDLay down. Remove pipe or a tool from the string and set it on the rack. (Drilling)
LELLower explosive limit. The lowest gas concentration in air that can ignite. Gas monitors read in % LEL. (Safety)
LOELease operating expense. The day-to-day cost of running a producing well. (Business)
LOTLeak-off test. A pressure test below the casing shoe until the formation starts to take fluid, to find its strength. (Drilling)
LOTOLockout/tagout. Isolating and locking energy sources before work on equipment. (Safety)
LPLanding point. Where a horizontal well reaches the target zone and levels out. (Drilling)
LTILost-time injury. An injury that keeps someone off work beyond the day it happened. (Safety)
LWDLogging while drilling. Formation logs recorded by tools in the BHA as the hole is drilled. (Drilling)
M
MAASPMaximum allowable annular surface pressure. The highest casing pressure at surface before the formation at the shoe could break down. (Drilling)
MBOEThousand barrels of oil equivalent. M is the Roman thousand in oil and gas; MM is a million. (Units)
MCFThousand cubic feet. Gas volume. MCFD is per day. (Production)
MDMeasured depth. Length of the hole measured along its path. In a deviated or horizontal well it is longer than the vertical depth. (Drilling)
MIRUMove in, rig up. Arriving on location and setting up. (Drilling)
MITMechanical integrity test. A test that a well, often an injection or disposal well, has no leaks in its casing, tubing or packer. Regulators set when it is due. (Completions)
MMCFMillion cubic feet. Gas volume. MMCFD (or MMSCFD) is per day. (Production)
MOCManagement of change. The process for reviewing and approving a change to equipment, procedures or people before it happens. (Safety)
MPDManaged pressure drilling. Drilling with the well closed at surface and pressure controlled by a choke. (Drilling)
MSAMaster service agreement. The contract between an operator and a service company. (Business)
MUMake up. Screwing a connection together, or assembling a tool or string. (Drilling)
MWMud weight. Density of the drilling fluid, usually in pounds per gallon (ppg). At a power or utility site, MW means megawatts. (Drilling)
MWDMeasurement while drilling. Downhole sensors in the BHA that send direction and other readings to surface while drilling. (Drilling)
N
ND / NUNipple down / nipple up. Removing or installing wellhead equipment such as a BOP or frac stack. (Completions)
NGLNatural gas liquids. Ethane, propane, butane and similar liquids separated from gas. (Production)
NPTNon-productive time. Rig time lost to problems, repairs or waiting, usually tracked in hours against a cause. (Drilling)
NRCNational Response Center. Where oil and chemical spills in the US are reported. Elsewhere, NRC often means the Nuclear Regulatory Commission. (Safety)
NRINet revenue interest. An owner’s share of production revenue after royalties. (Business)
O
OBMOil-based mud. Drilling fluid with oil as its base. (Drilling)
obsObservation / observed. What someone actually saw. (Shorthand)
OHOpen hole. The part of the well with no casing set in it yet. (Drilling)
OIMOffshore installation manager. The person in charge of an offshore installation. (Safety)
OSHAOccupational Safety and Health Administration. US federal workplace safety regulator. (Safety)
P
P&APlug and abandon. Permanently sealing a well that will no longer be used. (Production)
PBTDPlugged back total depth. The deepest point the well can be reached after plugs or cement, often shallower than TD. (Completions)
PDCPolycrystalline diamond compact. The most common type of fixed-cutter drill bit. (Drilling)
PKRPacker. A tool that seals the space between tubing and casing. (Completions)
pmpdPumped. "pmpd 40 bbl LCM pill". (Shorthand)
POOHPull out of hole. Bringing the drill string or a tool back to surface. Also written POH or TOOH. (Drilling)
possPossible. "poss hose leak" means the hose has not been confirmed as the cause. (Shorthand)
P&PPlug and perf. A completion method: set a plug, perforate the next stage, fracture, repeat. (Completions)
PPEPersonal protective equipment. Hard hats, glasses, gloves, FR clothing and the like. (Safety)
ppgPounds per gallon. Mud weight. (Units)
probProbable. Stronger than possible, still not confirmed. Some crews also use "prob" for "problem", so write it out. (Shorthand)
psiPounds per square inch. Pressure. (Units)
PSMProcess safety management. The OSHA standard, and the practice, for managing hazards in processes with highly hazardous chemicals. (Safety)
PSVPressure safety valve. A valve that opens to relieve pressure above its set point. (Safety)
PTWPermit to work. Written authorization for higher-risk work such as hot work or confined-space entry. (Safety)
PUPick up. Lift the string off bottom, or add pipe or a tool to it. (Drilling)
PVPlastic viscosity. A mud property linked to the solids in the fluid. (Drilling)
R
RBPRetrievable bridge plug. A plug that can be set and later pulled. (Completions)
RCDRotating control device. A seal around the drill pipe at surface that lets the well be drilled under pressure. (Drilling)
RDMORig down, move out. Taking equipment down and leaving location. (Drilling)
RIHRun in hole. Lowering pipe or a tool into the well. Many crews use RIH for tools and wireline and TIH for pipe trips; keep the crew’s word. (Drilling)
RKBRotary kelly bushing. Depth reference at the rig floor. Depths "from RKB" are measured from there. (Drilling)
ROPRate of penetration. How fast the bit is drilling, usually in feet per hour (fph). (Drilling)
RPMRevolutions per minute. Rotary speed of the drill string or bit. (Drilling)
RRCRailroad Commission of Texas. Despite the name, the agency that regulates oil and gas in Texas. (Safety)
RU / RDRig up / rig down. Setting up or taking down equipment, such as a crane, a wireline unit or the rig itself. (Drilling)
S
SBMSynthetic-based mud. Drilling fluid with a synthetic base oil, common offshore. (Drilling)
SBPSurface back pressure. Pressure held at surface by the choke during managed pressure drilling. (Drilling)
SCFStandard cubic feet. Gas volume at standard temperature and pressure. (Production)
SCRSlow circulating rate. Pump pressures recorded at reduced rates, kept ready for well control. (Drilling)
SCSSVSurface-controlled subsurface safety valve. A safety valve in the tubing, below ground, held open from surface. (Production)
SDSSafety data sheet. The sheet that lists a chemical’s hazards and handling. (Safety)
SIShut in. A well closed so it is not producing. (Production)
SICPShut-in casing pressure. Pressure on the casing (annulus) with the well closed in. (Production)
SIDPPShut-in drill pipe pressure. Pressure on the drill pipe after the well is shut in on a kick. (Drilling)
SITPShut-in tubing pressure. Pressure on the tubing with the well closed in. (Production)
SLSlickline. A single solid wire used to run tools that need no power. (Completions)
SOSlack off. Lower the string so its weight goes down the hole. (Drilling)
SPCCSpill prevention, control and countermeasure. An EPA-required plan for facilities that store oil above set amounts. (Safety)
SPFShots per foot. Perforating density. (Completions)
SPMStrokes per minute. Mud pump speed. (Drilling)
SPPStandpipe pressure. Pump pressure measured at the standpipe on the rig floor. (Drilling)
SSVSurface safety valve. A valve at the wellhead that closes automatically to shut the well in. (Production)
svySurvey. A directional measurement of the hole: depth, inclination and azimuth. (Shorthand)
SWAStop work authority. Anyone’s right to stop a job they believe is unsafe. (Safety)
SWDSaltwater disposal. A well or facility that takes produced water for disposal. (Production)
T
TATemporarily abandoned. A well shut in and secured but not permanently plugged. (Production)
TCPTubing-conveyed perforating. Perforating guns run on tubing instead of wireline. (Completions)
TDTotal depth. The deepest point of the well, or of a section. "Reached TD" means drilling of that section is finished. (Drilling)
TIHTrip in hole. Running the drill string back into the well, often written "TIH to 8,400 ft". (Drilling)
TOCTop of cement. The highest point the cement reached behind the casing. (Drilling)
TOLTop of liner. The depth where a liner (casing hung from the casing above) starts. (Drilling)
TPTubing pressure. Pressure on the tubing. (Production)
TRIRTotal recordable incident rate. Recordable injuries per 200,000 hours worked. (Safety)
TVDTrue vertical depth. Straight-down distance from the reference point. Pressures and formation tops are usually quoted in TVD, so say which depth you mean. (Drilling)
U
USCGUnited States Coast Guard. Notified of incidents on navigable waters, including offshore. (Safety)
V
VSVertical section. Horizontal distance from the well along the planned direction, used in directional plots. (Drilling)
W
WBMWater-based mud. Drilling fluid with water as its base. (Drilling)
WCWater cut. Water as a share of total liquid produced. (Production)
WHWellhead. The equipment at the top of the well that the casing hangs from and the BOP or tree sits on. (Drilling)
WIWorking interest. An owner’s share of a well’s costs, and the right to operate or share in it. (Business)
WLWireline. Cable used to run logging tools and perforating guns; electric line (e-line) carries power and data. (Completions)
WOWorkover. Work on an existing well to repair it or improve production. Not the same as "w/o" (without). (Completions)
WOBWeight on bit. The downward force applied to the bit, usually in thousands of pounds. (Drilling)
WOCWait on cement. Time spent waiting for cement to set before drilling ahead or testing. (Drilling)
WOOWait on orders. Time spent waiting for a decision before the next step. (Drilling)
WORWater-oil ratio. Barrels of water produced per barrel of oil. (Production)
WOWWait on weather. Time lost to weather, common offshore. (Drilling)
w/ , w/oWith, without. Common in notes. Not the same as WO (workover) or WOC, WOO and WOW (waiting). (Shorthand)
Y
YPYield point. A mud property: how well it carries cuttings. (Drilling)